Connect design and manufacturing.
Disconnected methods and documents across product and industrial engineering created rework and waste.
Problem
Disconnected methods and documents across product and industrial engineering created rework and waste.
Approach
Integrate methods, reuse 3D models and connect design, sheet nesting and cutting.
System
A methodology supported by Creo/ProENGINEER, NC Sheetmetal, procedures and team training.
Evidence
The detailed professional record of the integration project, recorded in the master résumé.
Outcome
BRL 380,000 in sheet-metal purchasing savings in the pilot. Sheet development reduced from two–three days to approximately three hours. The BRL 1.1 million annual projection refers to expanded cutting optimization.
Evidence and limitations
Results are recorded in professional sources; original corporate documents were not inspected in this review. The annual projection is an estimate. These improvements are not attributed to generative AI.
Editorial review: September 2026. Professional references and project records; internal data is not exposed.NEXT STEP
What problem do you want to solve?
Tell me what happens today, where the friction is and what needs to change. We can assess a path toward automation, a product or an AI system.